Test Case Overview
Author / organization: Tue Vissing Jensen / DTU
Test objective: characterization
Object Under Investigation:
- Booster Heater Controller
- Electric Storage Controller
- combination of Booster Heater and Electric Storage with the District Supervisory Controller
System configuration: Nordhavn NHN_001 system configuration
Use case: Joint UC3 - Heat for Electricity
NHN.TC1 - description
Short Description
This test seeks to characterize the impact use of local flexibility has on available regulating power from a local district. This test characterizes district operation with and without Booster Heater Controller and Electric Storage Controller active, seeking to demonstrate that the local controllers respond to service requests from the aggregator controller.
Media Gallery

NHN.TC1 - details
Test Case Details
Test objective name | NHN.TC1 | ||
Author / organization | Tue Vissing Jensen / DTU | ||
Short description | Characterizing service provision by power-to-heat units through supervisory controllers. | ||
Present use / development status | V1.0 |
Test objective | characterization | ||
Description incl. justification | This test seeks to characterize the impact use of local flexibility has on available regulating power from a local district. | ||
System configuration | This test applies to the generic Nordhavn NHN_001 system configuration (see deliverable D2.3, Appendix D), outlined in Figure B.1. “PCC” denotes the point of common coupling for the district to the various grids. | ||
Use case | This test seeks to establish how well the system is able to implement Joint UC3 - Heat for Electricity (see deliverable D3.1, Appendix 3.4, page 17). The district-integrated booster heater is used to provide services to the electrical system. |
System Under Test | All units connected downstream of the respective PCCs must be simulated.
| ||
Object Under Investigation | The characterization concerns the Booster Heater Controller and the Electric Storage Controller in combination with the District Supervisory Controller. | ||
Function Under Investigation | Under Joint UC3, the heating system provides services to the electrical system. The test targets an examination of the ability of the system to provide these services. Specific services examined are electrical import and export limitation. |
| |||
Objective Function / Target Metrics | The comparison is made on the electrical and heat exchange for their given PCC. The test is to be evaluated by the objective function “Trade-offs in heat for power” (see deliverable D4.2, Appendix B.6, page 31), with exogenous prices and relative weights. | ||
Acceptable test result | - |